• Compliance

    Building code requirements are becoming increasingly complex as additional policy objectives must be met.

  • Efficiency

    Population growth is quickly outpacing the capacity of permitting institutions to continue to rely on labour-intensive manual processes.

  • Public Safety

    The need to contain the ever-swelling stock of unregulated buildings in urban areas to mitigate short-term risks to safety and public health.

Unified

About the Unified

Development Permit Management System

This Platform is developed to enhance operational efficiency, promote digital integration and improve accessibility and transparency.

The project will help to:

  • Reduce the Turnaround time for development permit acquisition
  • Improve coordination in development permit administration
  • Serve as a repository of Data for planning and zoning purposes
  • Reduce administrative costs and costs associated with permit acquisition
  • Reduce risks and improve transparency in building permit acquisition

Process Flow for the acquisition

Development Permit

This platform provides a single point of entry to apply and obtain all permits for your structure/building.

Title Search

To ensure ownership, a search report is mandatory when the applicant lacks a land document such as a Land Title Certificate or an Indenture with a site plan.

Fire Permit

Proponents of a building or structure are required to obtain Fire Permit from the Ghana National Fire Service.

Environmental Permit

An Environmental Impact Assessment report is required to be issued by EPA depending on the complexities of the project.

Building Permit

The MMDA having satisfied its with all necessary requirements from the proponent, will issue a development permit for the project.

Check List for Title Search

  1. (i) Perspective Drawings
  2. (ii) Floor Plans
  3. (iii) Land Document (Indenture or Certificate)

Check List for Fire Permit

  • (i) Perspective Drawings
  • (ii) Floor Plans
  • (iii) Land Document

Requirements Checklist – Building Permit

  • (i) Building Permit Application Form
  • (ii) Title Search
  • (iii) Indenture or Deed of assignment or Land Title Certificate
  • (iv) Architectural Drawing four(4) copies
  • (v) Structural Drawings four(4) copies
  • (vi) Structural Calculation Report four(4) copies
  • (vii) Fire Report – Upload
  • (viii) Mechanical or Services Drawing
  • (ix) Geotechnical Report Structural Integrity Report
  • (x) Environmental Permit
  • (xi) Traffic Impact Assessment (T.I.A)
  • (xii) Hydrological Services Report (if requested)
  • (xiii) Property Rate

Have Questions? Get Answers

Development Permit Requirements

  • Q1. Activities that require Development and Building permit

    • Erection of any building or structure except those exempted by law
    • Making structural alteration and or transformation (renovation) to a Building
    • Certificate of Completion for Habitation
    • Temporary Structure Permit
    • Regularization of Existing Structures
    • Extension of Existing Building
    • Demolition Permit
  • A. Erection of any building or structure except those exempted by law

    - All physical development involving the erection of any structure
    - Making of structural alteration or transformation of any structure
    - Execution of any works or installation of any fittings in connection with any structure
    - Engineering, mining or other operations on, in, under or over land or the material change in the existing use of land or building comprising among others the sub-division of land
    - Disposal of waste on land including the discharge of effluent into a body of still or running water
    - The erection of an advertisement or other hoarding among others shall require a development permit. Act 480, Section 48; Act 936, Sections 91 (1) & 106 (1) and Act 925 Sections 113 & 117 (1&2);

  • B. Making structural alteration and or transformation (renovation) to a Building

    Any transformation to a building or structure to restore it to its original state in terms façade, fixtures or sewage system shall require a renovation permit from the Assembly. Also a transformation or alteration of any permitted structure or building which results in structural changes (remodeling) shall require a permit from the Assembly

  • C. Extension of Time

    A development/building permit issued is valid for 5years as per Instrument 7 of L.I.1630, 1996 (5 years). Consequently, a developer who is an enable to complete development shall apply for planning permission for an extension of time.

  • D. Certificate of Completion for Habitation

    A developer is required to apply for a completion certificate for habitation before occupying a building after completion as per Regulation 10-7 L. I. 1630, Act 925, Section 161

  • E. Temporary Structure Permit

    A temporary structure is any physical structure constructed, installed or placed on spaces zoned for permanent uses and meant to facilitate the construction of a permanent structure, serve short term emergency needs or facilitate small scale business operations. The temporary permit shall be renewable every six months for a period not exceeding five years.

    • Permits for Temporary structures shall be issued to developments that are not permanent in nature.
    • Permits for Temporary structures shall be renewed every 6 months.

    Temporary Structure Permit applications shall be presented on form. The basic requirements for a temporary structure permit are:

    • i. Application form
    • ii. Evidence of good title to the land or permission from relevant stakeholders
    • iii. Site Plan to the scale of 1:2500 or 1:1250 and conforming to the local plan of the area
    • iv. Block Plan to the scale of 1:50
    • v. Designs of proposed temporary structures

    An applicant shall be required to obtain all necessary approvals, permits and licenses from relevant central and local government authorities.

  • F. Regularization of Existing Structures

    Regularization of permit shall be undertaken for all structures that have been developed without permits. Only structures that meet minimum condition for the grant for regular development permit shall qualify for the grant of regularization permit All applications to regularize permits for existing structures shall be required to submit all requirements listed for the category of such structures in addition to Structure Integrity Report

  • G. Extension of Existing Building

    The addition of a usable area or utility space to an existing structure shall constitute an extension. Applications for permit to extend existing structures which do not have prior permit shall be treated solely as applications for regularization of permit.

  • H. Demolition Permit

    All demolition works shall require permit from the Assembly. Sufficient precaution shall be taken to safeguard public safety, health, adjoining properties and properties with heritage significance. Pollution in relation to air, water, noise and soils shall be avoided or properly mitigated.

    Application for Demolition Permit

    Persons seeking to apply for demolition permit shall complete an application form designed for the purpose including information that ensures that the following basic requirements have been fully fulfilled:

    • i. Site plan
    • ii. Block plan
    • iii. Demolition plan and precautions outlined
    • iv. Current Pictures of the structures to be demolished
    • v. Acknowledgment of utility services disconnection (electricity, water, sewer, etc)

    Apart from the cost of the Permit Application Form and Processing Fees, all other costs are arrived after going through each process based on the fee fixing resolution of the Assembly for that year. The Fee fixing Resolution for each year is published on the Assembly’s Website and copies can also be purchased as the Ghana Publishing Company (Assembly Press).

  • Q2. Statutory requirements for a Development/Building permit

    • 1. Submit your full set of application to the Physical Planning Department
    • 2. Attach completed land ownership document from Lands Commission
    • 3. Attach four copies of architectural drawings signed by a certified Architect
    • 4. Attach four copies of structural drawings signed by an Engineer
    • 5. Proposed development must conform to zoning status
    • 6. A certified soil test report
    • 7. Fire certified report including drawings from the Ghana National Fire Service
    • 8. Environmental Protection Agency Permit
    • 9. Structural integrity report in case construction development has already commenced or is completed

    In addition to the statutory requirements above, the following requirements also apply;
    • 1. Business Registration Certificate (for organizations).
    • 2. Business Operating Permit (for organizations).
    • 3. Up to date Property Rate payment (Existing Buildings)
    Note: For Organisations: A developer may be asked to provide additional information depending on usage, size, etc. For Existing Buildings: Some Development Projects require a prior application for “Planning Permission –in- Principle” before application for a substantive Development /Building permit.

News & Articles

Have a concerns?

Send Us a Message

Commercial
Waste Services
in your Area

Need help?
Talk to an expert

+ 1- (246) 333-0089

Have any questions?

+1-(246) 333-0089

Lorem ipsum dolor sit amet nsectetur cing elituspe ndisse suscipit sagitis leo sit.